12/26/2023 0 Comments Jim fink reddit![]() We strongly believe in building long-lasting relationships and are committed to helping all our businesses not only survive but thrive for years to come.” “We are proud to have partnered with our local businesses for the last 22 years, but especially as they’ve weathered the uncertainty of the pandemic. “The last couple of years have been a challenge, especially for small businesses,” said Terry Taylor, Oak Bank president. The 7(a) Loan Program is the SBA’s most common small business loan program that helps businesses cover a variety of needs, including working capital, purchasing new equipment and new building construction. Oak Bank received the honor for having the most approved 7(a) loans in the state among similar-sized banks. Oak Bank announced they are the recipient of the 2021 Wisconsin Small Business Administration (SBA) Volume Lender Award for banks with an asset size between $400 and $500 million. Onrait reassured, though, that the “land is secured,” and the city’s timeline is on track.Oak Bank ranks at the top among Wisconsin banks of its size in the number of primary loans approved for small businesses in 2021 Fink thinks there is “no way” the new park can be built in time for the 2017 season as promised. Kuffner and Pacers director Jim Fink are also wary about the fact that the city has yet to finalize the land purchase, which was announced in September. Onrait said the city is “OK” with the distance to the bypass, and has confirmed with the Ministry of Highways and an engineering group that the buffer zone is “more than adequate.” The league fears balls being hit onto the highway or cars veering off-course into the field. The proximity of the parcel to the future bypass is one concern: it’s about 100 feet away. Pacers representatives say they did not have input in the selection of the land and they aren’t particularly fond of it. The selection of the new parcel of land, just 2.5 kilometres north on Tower Road from the previous park, is a sensitive point, too. Onrait said that will be determined in upcoming conversations on the park’s design. Although the parcels of land are the same size, they’re a different shape, and the league is worried its 14 diamonds won’t be able to fit. ![]() ![]() The park’s design is only in preliminary stages, and Onrait said “just bringing the ballpark to current standards” through the designs of an engineering firm “will make this ballpark better than the last ballpark.”īut then there’s the question of whether Pacers will even see all of their diamonds transposed to the new location. “We feel as a baseball community that we haven’t had the chance - there hasn’t been a chance like this - to develop a super park or a field of dreams,” said Kelly Newman, a member of the Baseball Regina board, who highlighted the sport’s growing popularity in the city. This advertisement has not loaded yet, but your article continues below. The league is emphasizing, though, that it wants the city to take this opportunity to build better. So, too, does the city’s contract with Pacers. The agreement with the provincial government, which expropriated the city’s land on which Pacer Park sits, covers land and relocation compensation to rebuild a park to “comparable standards,” said Onrait. That includes not only that Pacers will indeed have a spot at the design table, but that the city will heed the organization’s advice about bringing the ball diamonds up to current standards. He said the contrast in tone week to week might stem from a “lack of communication on both parts,” and that many of Pacers’ concerns have now been addressed. “This is a complex project, and I think no different than other projects we’re involved in with community partners, these things take time to work through.” “The conversations with Pacers regarding the project are going well,” said the municipality’s executive director of city services Kim Onrait. “Right now, all we’re doing with the city is butting heads.”īut that tone flipped on its head this week after what both sides considered a positive meeting. “We have not had any input into how to design the park,” said Pacers president Tony Kuffner. Manage Print Subscription / Tax Receipt.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |